Quick answer: A useful high-level condition report lets you find every defect again, understand how urgent it is, and act on it. It should contain: a summary of priorities; the scope and limitations (what was and wasn't inspected); a defect schedule where every item has a unique reference, exact location, photo, description, urgency rating and recommended action; a record of anything made safe; marked-up elevations; and recommendations, including when to inspect next. If a report is just a folder of photos, it isn't a condition report.
The template
1. Summary (1 page)
- Overall condition in two or three sentences.
- Number of defects by urgency.
- The top 3–5 actions.
2. Scope and limitations
- Address, elevations and drops inspected; date; weather.
- Method: close-access rope inspection, tap testing, hand checks.
- What wasn't inspected, and why, e.g. "Drop E7 not accessed: no anchorage."
- What the report isn't, e.g. "not a structural assessment".
3. Defect schedule
| Ref | Elevation / level / drop | Element | Defect | Photo | Urgency | Recommended action |
|---|---|---|---|---|---|---|
| N-04-02 | North / L4 / Drop 2 | Stone sill | Cracked, loose section ~150 mm | P-031, P-032 | 🔴 1 – Made safe on day | Replace sill section |
| E-07-01 | East / L7 / Drop 1 | Window perimeter sealant | Adhesive failure, 1.2 m | P-058 | 🟠 2 | Cut out and re-seal |
| S-R-03 | South / Roof / Drop 3 | Coping joint | Open joint, mortar loss | P-077 | 🟡 3 | Re-point / re-seal joint |
A simple urgency scale:
- 🔴 1. Immediate: a risk to people or significant water entry. Made safe on the day or within days.
- 🟠 2. Short term: within 3–6 months, before the next winter.
- 🟡 3. Medium term: within 1–2 years, and plan it into budgets.
- ⚪ 4. Monitor: re-check at the next inspection.
4. Make-safe record
What was removed or secured, where, with before and after photos, and whether it needs follow-up.
5. Marked-up elevations
Photos or drawings of each elevation, with defect references plotted on them. This is what lets a repair team find "N-04-02" months later.
6. Recommendations
- Repairs, grouped so they can be done in one mobilisation.
- Items needing a specialist (structural engineer, façade engineer, roofer).
- Next inspection date.
7. Appendices
Photo log, anchor certificate reference, team and IRATA details.
What makes a report actually useful
- Every photo has a reference and links to a defect.
- Locations are repeatable: elevation, level, drop and gridline.
- Urgency is explained, not just labelled.
- Limitations are honest. "Not inspected" is better than an implied all-clear.
- It's readable by a non-specialist and detailed enough for a contractor to price from.
FAQ
How quickly should I get the report?
For a standard inspection, typically within 1–2 weeks. Urgent items should be reported on the day.
Can the report be used to get repair quotes?
Yes. That's one of its main purposes. A good defect schedule lets any contractor price the same work.
Does the report certify the façade as safe?
No. It records the condition found on the day within the stated limitations. It isn't a guarantee or a structural certificate.
Get a report you can act on
See our building maintenance and rope access in London, or request a site survey.
Sources
- BS 8210:2020, Facilities maintenance management (maintenance records).
- RICS guidance on condition reporting (general principles).