Quick answer: Most UK commercial buildings have no single legal interval for façade inspection, but a sensible schedule is: façade visual check from the ground every year, close-access façade inspection every 5 years (more often for older, taller or stone and concrete buildings), roofs twice a year (spring and autumn), gutters and outlets at least once a year after leaf fall, roof anchors every 12 months (BS 7883), BMUs every 6 months (LOLER thorough examination), and an extra check after every major storm.
Recommended inspection schedule
| Element | Interval | Basis |
|---|---|---|
| Façade (ground-level visual + binoculars) | Every 12 months, and after storms | Good practice; duty of care |
| Façade (close-access inspection) | Every 5 years. Every 2–3 years for older stone or terracotta, concrete-framed buildings or known problems. | Good practice |
| Roof coverings | Twice a year (spring and autumn) and after storms | Common industry guidance |
| Gutters, outlets, downpipes | At least annually, after leaf fall. Twice a year near trees. | Good practice |
| Sealant joints | Check during every façade and cleaning visit. Plan replacement at roughly 10–20 years depending on type and exposure. | Product life |
| Roof anchors & fall-arrest systems | At least every 12 months | BS 7883:2019 |
| BMU / cradle | Thorough examination typically every 6 months, plus pre-use checks | LOLER 1998 |
| Mansafe/lifeline systems | At least every 12 months | BS 7883 / manufacturer |
| External fixings (signage, lighting, CCTV) | Annually, and after storms | Good practice |
Which buildings need shorter intervals?
Inspect more often if the building:
- is pre-1950s with stone, terracotta or faience, which have heavier fixings and corroding iron cramps;
- has a concrete frame or concrete panels, where carbonation and reinforcement corrosion lead to spalling;
- overhangs busy pavements or entrances, where the consequences of falling material are higher;
- has had previous falls of material, leaks or repairs;
- is a higher-risk residential building (at least 18 m or seven storeys with two or more homes), where the Building Safety Act 2022 requires the accountable person to manage building safety risks;
- is in an exposed location, such as near the river or at height with prevailing wind.
Link inspections to other visits
You can cut costs by combining:
- façade cleaning + condition check: technicians are already at arm's length from the façade;
- gutter clearance + roof inspection;
- anchor inspection + rope access work: get the anchors tested before the job, so the team isn't delayed.
Keep a simple inspection register
| Element | Last inspected | By | Next due | Report ref |
|---|---|---|---|---|
| Façade (close access) | ||||
| Roof | ||||
| Gutters | ||||
| Anchors | ||||
| BMU |
A register like this shows that you're managing the building responsibly, which matters to insurers, buyers and, if anything ever goes wrong, investigators.
FAQ
Is façade inspection a legal requirement in the UK?
For most commercial buildings there's no fixed statutory interval. Owners and occupiers do have a duty of care (Occupiers' Liability Acts) and health and safety duties to people near the building. Regular inspection is how you demonstrate it. Leases and insurers often set requirements too.
What about New York-style five-year façade laws?
The UK doesn't have an equivalent of New York's Local Law 11 for commercial buildings. Many UK owners use a five-year close-inspection cycle as a sensible benchmark.
Can inspections be done in winter?
Yes, though short days and weather reduce productivity. Autumn is ideal, because it lets you fix problems before winter storms.
Set up an inspection programme
We can inspect on a rolling cycle and keep your register up to date. See our building maintenance and rope access in London, or request a site survey.
Sources
- BS 7883:2019; LOLER 1998.
- Building Safety Act 2022.
- Occupiers' Liability Acts 1957 and 1984.
- BS 8210:2020, Facilities maintenance management.