24/7 Emergency Rope Access 07469 343612

How Often Should a Commercial Building Exterior Be Inspected?

A practical inspection schedule for building exteriors: façades, roofs, gutters, sealant and anchors, with recommended intervals and standards.

Quick answer: Most UK commercial buildings have no single legal interval for façade inspection, but a sensible schedule is: façade visual check from the ground every year, close-access façade inspection every 5 years (more often for older, taller or stone and concrete buildings), roofs twice a year (spring and autumn), gutters and outlets at least once a year after leaf fall, roof anchors every 12 months (BS 7883), BMUs every 6 months (LOLER thorough examination), and an extra check after every major storm.

ElementIntervalBasis
Façade (ground-level visual + binoculars)Every 12 months, and after stormsGood practice; duty of care
Façade (close-access inspection)Every 5 years. Every 2–3 years for older stone or terracotta, concrete-framed buildings or known problems.Good practice
Roof coveringsTwice a year (spring and autumn) and after stormsCommon industry guidance
Gutters, outlets, downpipesAt least annually, after leaf fall. Twice a year near trees.Good practice
Sealant jointsCheck during every façade and cleaning visit. Plan replacement at roughly 10–20 years depending on type and exposure.Product life
Roof anchors & fall-arrest systemsAt least every 12 monthsBS 7883:2019
BMU / cradleThorough examination typically every 6 months, plus pre-use checksLOLER 1998
Mansafe/lifeline systemsAt least every 12 monthsBS 7883 / manufacturer
External fixings (signage, lighting, CCTV)Annually, and after stormsGood practice

Which buildings need shorter intervals?

Inspect more often if the building:

  • is pre-1950s with stone, terracotta or faience, which have heavier fixings and corroding iron cramps;
  • has a concrete frame or concrete panels, where carbonation and reinforcement corrosion lead to spalling;
  • overhangs busy pavements or entrances, where the consequences of falling material are higher;
  • has had previous falls of material, leaks or repairs;
  • is a higher-risk residential building (at least 18 m or seven storeys with two or more homes), where the Building Safety Act 2022 requires the accountable person to manage building safety risks;
  • is in an exposed location, such as near the river or at height with prevailing wind.

You can cut costs by combining:

  • façade cleaning + condition check: technicians are already at arm's length from the façade;
  • gutter clearance + roof inspection;
  • anchor inspection + rope access work: get the anchors tested before the job, so the team isn't delayed.

Keep a simple inspection register

ElementLast inspectedByNext dueReport ref
Façade (close access)
Roof
Gutters
Anchors
BMU

A register like this shows that you're managing the building responsibly, which matters to insurers, buyers and, if anything ever goes wrong, investigators.

FAQ

For most commercial buildings there's no fixed statutory interval. Owners and occupiers do have a duty of care (Occupiers' Liability Acts) and health and safety duties to people near the building. Regular inspection is how you demonstrate it. Leases and insurers often set requirements too.

What about New York-style five-year façade laws?

The UK doesn't have an equivalent of New York's Local Law 11 for commercial buildings. Many UK owners use a five-year close-inspection cycle as a sensible benchmark.

Can inspections be done in winter?

Yes, though short days and weather reduce productivity. Autumn is ideal, because it lets you fix problems before winter storms.

Set up an inspection programme

We can inspect on a rolling cycle and keep your register up to date. See our building maintenance and rope access in London, or request a site survey.

Sources

  • BS 7883:2019; LOLER 1998.
  • Building Safety Act 2022.
  • Occupiers' Liability Acts 1957 and 1984.
  • BS 8210:2020, Facilities maintenance management.
Keep reading

More guides

When Is Rope Access the Right Choice for High-Level Building Work?

Is rope access right for your job? A task-by-task guide to what it does well, where it struggles and when scaffold or a MEWP is better.

Read the guide →

When Should a Building's Anchor Provision Be Reviewed?

Beyond the annual BS 7883 inspection, seven situations mean your roof anchors need reviewing, such as refurbishment, new plant and missing records.

Read the guide →

When Cleaning Is Not Enough: Signs a Façade Needs Repair

A façade clean often uncovers defects the dirt was hiding: cracks, open joints, failed sealant, rust and spalling. What each means and what to do next.

Read the guide →
Planning work at height?

Need help with your building? Talk to our team.