24/7 Emergency Rope Access 07469 343612

Preparing a Commercial Building for Winter: Exterior Maintenance Checklist

Get your commercial building's roof, gutters, façade and fixings winter-ready, with a practical exterior checklist, timings and a storm plan.

Quick answer: Before the first winter storms, make sure gutters, outlets and downpipes are clear after the leaves have fallen, roof coverings, flashings and copings are secure, sealant and façade joints are intact, nothing high up can blow loose (signage, cladding, bird netting, aerials), and a storm plan is ready with a contractor booked. Do sealant and coating work before temperatures drop below about 5 °C, because most products can't be applied properly in the cold.

The exterior winter checklist

Roofs and drainage (highest priority)

  • Clear gutters, valleys, outlets and downpipes, ideally after the main leaf fall, which in London is usually from late November. Check that rainwater flows freely at ground level too.
  • Check outlet grates and leaf guards are in place, and keep siphonic outlets clear of debris.
  • Inspect flat roof membranes for splits, blisters and open laps, and pitched roofs for slipped or missing tiles and slates.
  • Check flashings, upstands and copings: lifted lead, open joints, loose cappings.
  • Look for ponding water and remove debris from roofs.
  • Check roof anchors and edge protection are in date. BS 7883 recommends inspection at least every 12 months, and you'll need them for any winter call-out.

Façade

  • Sealant joints around windows and panels: re-seal anything cracked, split or debonded while it's still mild enough.
  • Loose elements: cladding panels, stone, render, tiles. Loose material can be dislodged by frost and high wind.
  • Porous stone and brick: water in cracks expands when it freezes and widens them, so repair open joints and cracks before winter.
  • Window and curtain-wall drainage slots clear.
  • Overhangs and canopies: check for areas where ice or snow could build up above walkways.

Fixings and attachments

  • Signage, lighting, CCTV, aerials and satellite dishes are securely fixed.
  • Bird netting and spikes are intact, because loose netting flaps and tears in storms.
  • Balustrades, plant screens and rooftop plant are fixed down.

Coatings

  • Finish any external painting before winter. Most coatings need dry surfaces, temperatures above about 5 °C, and the surface to be at least 3 °C above the dew point. Short winter days rarely allow this.

Planning

  • Storm plan: who checks the building after a named storm, the emergency contractor's number, and how to cordon the pavement.
  • Keys, roof access and permits ready for out-of-hours call-outs.
  • Records: photograph the condition now, so you can show what storm damage changed (useful for insurance claims).

When to do what

WhenTask
October–early NovemberSealant repairs, coatings, façade make-safes, roof repairs (while it's still mild and dry)
Late November–DecemberGutter and outlet clearance after the leaves fall; second clearance on sites with heavy tree cover
After every named stormA ground-level walk-round and binocular check; close-access inspection of anything suspicious
January–FebruaryRe-check gutters and outlets; inspect for frost damage
MarchPost-winter inspection and planned repairs for spring

After a storm: the 30-minute walk-round

  1. Check the ground around the building for fragments: slate, stone, sealant, glass.
  2. Use binoculars on copings, parapets, signage and cladding.
  3. Look for flapping membranes, netting or flashings on roofs visible from neighbouring buildings.
  4. Check inside the top floors for new leaks.
  5. Cordon anything suspicious and call for close-access inspection.

The Met Office names storms that are expected to have a significant impact. A named-storm warning is a good trigger for your plan.

Why get this done by rope access

  • No scaffolding in winter: scaffold left up through the winter months adds wind risk, security risk and weeks of hire.
  • Fast response after storms: a rope team can be on a roof edge within hours.
  • One visit, several jobs: gutters, sealant, loose elements and an inspection combined into one mobilisation.

FAQ

When should commercial gutters be cleaned?

At least once a year, ideally after the autumn leaf fall. Buildings near trees often need it twice: late autumn and early spring.

Can sealant be applied in winter?

Most sealants have a minimum application temperature, often around 5 °C, and need dry, clean joints. Small repairs are possible on mild, dry days, but planned re-sealing should be done before winter.

Who is responsible if something falls off my building?

Owners and occupiers have a duty of care to people on and around the property (Occupiers' Liability Acts 1957 and 1984). Responsibility between landlord and tenant is usually set out in the lease.

Book your winter check

We'll inspect, clear and make safe in one visit. See our building maintenance and roof repairs, or book a winter check.

Sources

  • Met Office, UK storm naming.
  • BS 7883:2019 (anchor inspection frequency).
  • ISO 8502-4 (assessing the likelihood of condensation before painting: the dew-point rule).
  • Occupiers' Liability Acts 1957 and 1984.
Keep reading

More guides

When Is Rope Access the Right Choice for High-Level Building Work?

Is rope access right for your job? A task-by-task guide to what it does well, where it struggles and when scaffold or a MEWP is better.

Read the guide →

When Should a Building's Anchor Provision Be Reviewed?

Beyond the annual BS 7883 inspection, seven situations mean your roof anchors need reviewing, such as refurbishment, new plant and missing records.

Read the guide →

When Cleaning Is Not Enough: Signs a Façade Needs Repair

A façade clean often uncovers defects the dirt was hiding: cracks, open joints, failed sealant, rust and spalling. What each means and what to do next.

Read the guide →
Planning work at height?

Need help with your building? Talk to our team.