Quick answer: Choose a contractor that can prove five things before you sign: IRATA-certified technicians supervised on site by a Level 3, adequate insurance, job-specific RAMS that include a rescue plan, evidence of similar work, and a clear statement of what you'll receive at the end. Anyone who can't produce these quickly, or who quotes without asking questions about your building, is a risk to your site and to your budget.
The 10-point checklist
Use this as a scoring sheet when comparing bids.
| # | Check | What "good" looks like | How to verify |
|---|---|---|---|
| 1 | Technician certification | Every technician holds a current IRATA (or equivalent SPRAT) certificate. IRATA certificates are valid for 3 years. | Ask for names and IRATA numbers and check them on IRATA's online technician verification |
| 2 | Level 3 supervision | A named Level 3 is responsible for the work on site, as the IRATA ICOP requires | The Level 3 is named in the RAMS and on site, not just "available" |
| 3 | Company status | An IRATA member company, or a clear explanation of how the firm works to the ICOP | IRATA member directory |
| 4 | Insurance | Employer's liability (a legal requirement, minimum £5m) and public liability suited to the site. Commercial clients commonly ask for £5m–£10m. | Certificates with dates, not a promise |
| 5 | RAMS | A risk assessment and method statement written for your building, covering anchorage, exclusion zones, weather limits and the public | Look for your building's name, drops and features in it. Generic templates fail this test. |
| 6 | Rescue plan | A written plan showing how a technician would be recovered by the team on site, without relying on 999 | It should be in the RAMS, with named rescue-trained team members |
| 7 | Anchorage | Confirms existing anchors are in date (BS 7883 recommends inspection at least every 12 months) or proposes a suitable alternative | Ask to see the last anchor test certificate or the proposal |
| 8 | Equipment | Ropes and equipment inspected and recorded under LOLER | Ask how inspections are logged |
| 9 | Relevant experience | Similar buildings and tasks, with references | Two references from facilities managers or managing agents |
| 10 | Deliverables | Photos, a short report, any defects found, and a warranty on workmanship where relevant | Agree it in writing before work starts |
Health and safety accreditations such as CHAS, SafeContractor, Constructionline or SSIP-member schemes are useful shortcuts, but they don't replace checks 1–7.
Seven questions to ask in the pre-appointment call
- "What have you understood the job to be, and what don't you know yet?" A good contractor lists their assumptions.
- "Why is rope access right for this job, and when wouldn't it be?" They should be able to explain the Work at Height Regulations 2005 reasoning simply.
- "Who exactly will be on site, and who is the Level 3?"
- "Where will you anchor, and when was it last tested?"
- "How will you protect tenants, visitors and the pavement?" Expect an answer covering exclusion zones, signage, timing and communication.
- "What happens if the weather turns?" Ask about stop limits and whether you're charged for weather days.
- "What will I have in my hands when you leave?" Photos, a report, a defect list, warranty terms.
Red flags
- A price without a survey on anything beyond the simplest job, or a price from photos with no stated assumptions.
- Generic RAMS that don't mention your building.
- No named Level 3, or "our Level 3 will pop in".
- Can't show certificates for technicians or insurance within a day or two.
- No rescue plan, or "we'd call the fire brigade".
- Pressure to start immediately without a pre-start meeting or a plan for the public.
- Vague deliverables, such as "we'll send some photos".
How to compare quotes fairly
The cheapest quote often prices a smaller scope. Put bids side by side on:
- the same areas and tasks (elevations, drops, number of defects);
- inclusions: access, materials, reporting, waste, out-of-hours working;
- exclusions and provisional sums: what happens if more defects are found?
- programme and weather terms;
- deliverables and warranty.
If one bid includes an inspection report and another doesn't, they aren't like-for-like.
What it means if your work counts as construction
Repairs, refurbishment and some maintenance count as "construction work" under the Construction (Design and Management) Regulations 2015 (CDM). In that case the client has duties too, including providing pre-construction information and making sure the contractor has enough time and resources. Your contractor should tell you if CDM applies.
FAQ
What's the difference between IRATA Level 1, 2 and 3?
Level 1 technicians work under supervision. Level 2s are experienced technicians who can rig and carry out rescues. Level 3s are the supervisors responsible for the work site, safety and rescue. Moving up each level needs at least 1,000 logged hours and 12 months at the level below. See our guide what IRATA certification means for property managers.
Should I always pick an IRATA member company?
It's a strong signal, because member companies are audited against the ICOP, but the people on your job matter most. Check the individual certificates and the named Level 3 either way.
How many quotes should I get?
Three is typical. Give every bidder the same written brief and photos so you can compare them.
Ready to put us through the checklist?
We're happy to be scored against every point above. Ask for our certificates and an example RAMS at the survey. Find out more about our rope access in London and our high-level services, or book a free site survey.
Sources
- IRATA International Code of Practice (ICOP) and IRATA technician verification.
- Work at Height Regulations 2005; LOLER 1998; CDM 2015.
- Employers' Liability (Compulsory Insurance) Act 1969 (£5m minimum cover).
- BS 7883:2019 (anchor systems).