Quick answer: On most high-level jobs, a big share of the cost is getting there: surveys, RAMS, rigging, exclusion zones, roof access and moving between drops. So bundling tasks into one visit usually cuts the total cost and reduces disruption for tenants. Tasks that combine well include cleaning + inspection + sealant repairs + gutter clearance + bird-proofing checks + small make-safes. Tasks that don't combine well are ones with conflicting conditions (e.g. wet cleaning and sealant application on the same joint the same day) or that need different specialist trades or equipment.
Tasks that combine well
| Combine | Why it works |
|---|---|
| Façade clean + condition check | Technicians are already at arm's length; defects are photographed as they're found |
| Gutter/outlet clearance + roof inspection | Same roof access and anchors |
| Sealant repairs + inspection | The inspection finds the joints; the same team repairs them on the same drop |
| Cleaning + bird-proofing check/repair | Netting and spikes are on the same ledges |
| Any rope work + small make-safes | Loose material removed immediately, without a second visit |
| Anchor inspection + first job of the year | Tested anchors, then straight into work |
| Signage or lighting checks + cleaning | Same drops |
Tasks that need care or separate visits
- Cleaning then sealant/painting: surfaces must be dry, so sequence them: clean first, then return to the same drop later, or the next day.
- Biocide treatment then painting: allow the treatment time specified by the manufacturer.
- Heavy repairs needing materials lifting or scaffold.
- Specialist trades (electrical, glazing replacement, structural), unless the contractor has the competence.
- Different access methods, such as MEWP work at ground level, which may need separate planning.
How to plan a combined visit
- Start from the defect register or inspection report, and list everything due in the next 6–12 months.
- Group by elevation and drop, not by trade.
- Sequence within each drop: inspect → clean → dry → repair → proof → photograph.
- Agree authority limits for on-the-spot repairs.
- One RAMS, one tenant notice, one set of exclusion zones.
- One report covering everything, referenced by drop.
Where the savings come from
- Fewer survey, RAMS and mobilisation costs.
- Fewer rigging cycles: each drop is rigged once.
- One tenant disruption window, not four.
- Earlier defect detection, so cheaper repairs.
FAQ
Won't a combined visit take longer?
The visit is longer, but the total time on site across the year is usually shorter, and tenants are disturbed once.
Can different contractors share the access?
Sometimes, but responsibilities, RAMS and supervision get complicated. A single contractor with the right competences is simpler.
What's the best time of year for a combined visit?
Early autumn suits most buildings: dry enough for sealant and coatings, with gutters cleared and defects fixed before winter.
Plan a combined visit
See our building maintenance and services, or request a site survey. Related: how to prioritise external building defects.
Sources
- BS 8210:2020 (planned maintenance).
- Work at Height Regulations 2005 (planning work at height).