What a Commercial Façade Inspection Should Include

What a proper façade inspection covers: close visual checks, tap testing, fixings, sealant, glazing, copings and drainage, and the report you should get.

Quick answer: A proper commercial façade inspection should include a close-access visual inspection of every agreed drop (within arm's reach, not just binoculars); tap testing of stone, render, tiles and concrete for hollow or loose areas; checks of fixings, cramps and brackets where visible; sealant and gasket condition; glazing, copings, parapets and flashings; drainage (drips, weep holes, gutters); and any attachments such as signage and bird netting. You should receive a photo-referenced defect report with locations, urgency ratings and recommendations, and anything dangerous should be made safe on the day.

The inspection checklist

ElementWhat's checkedHow
Stone, brick, terracottaCracks, spalls, loose units, open joints, failed pointing, displaced piecesVisual + tap test with a hammer
RenderCracking, hollow areas, debonding, bulgesTap test, visual
ConcreteSpalling, exposed or rusting reinforcement, rust stainingVisual + tap test; cover meter if specified
Metal claddingCoating breakdown, corrosion, loose panels, missing fixingsVisual, hand check
Glazing / curtain wallingCracked glass, failed or misted units, gasket shrinkage, pressure-plate and cap fixingsVisual, hand check
Sealant jointsCracking, hardening, loss of adhesion, gapsVisual + hand/probe check
Copings, parapets, cornicesOpen joints, rocking stones, failed cappings, vegetationHand check, tap test
Flashings & roof-wall junctionsLifted lead, open laps, failed upstandsVisual, hand check
DrainageBlocked drips, weep holes, curtain-wall drainage slots, guttersVisual
AttachmentsSignage brackets, lighting, CCTV, aerials, bird netting, redundant fixingsHand check
Access equipmentAnchors, davits, BMU tracks (condition only; certification is separate)Visual; check certificate dates

Why "close access" matters

From the ground or a drone you can spot obvious problems, but you can't tap-test stone, feel a loose cramp, test sealant adhesion or remove a loose fragment. Close-access inspection by rope access puts a technician at arm's length from every point on each drop. It's also the only method that can make safe on the spot, for example by removing loose material that would otherwise be a hazard to the pavement.

What the report should contain

  1. Summary: overall condition and the top priorities.
  2. Scope and limitations: which drops were inspected, what wasn't accessible, and the weather on the day.
  3. Defect schedule: each defect with a reference number, location (elevation, level, drop), photo, description, urgency rating and recommended action.
  4. Make-safe record: what was removed or secured on the day.
  5. Marked-up elevations showing where each defect is.
  6. Recommendations: repairs, further investigation, specialist input, and when to inspect next.

See what should be in a high-level condition report for a full template.

How long does it take?

That depends on the number of drops and the façade type. How many drops a team covers in a day depends on the façade and the detail needed, and ornate stonework takes longer. The contractor should confirm the time on site and when the report will follow.

FAQ

How often should a façade be inspected?

A common approach is annual visual checks, plus a close-access inspection every five years, with shorter cycles for older, taller or stone and concrete buildings. See how often to inspect a commercial building exterior.

Is tap testing safe for the façade?

Yes. It's done with a light hammer to listen for hollow sounds, and it's a standard technique for finding loose material before it falls.

Can repairs be done during the inspection?

Small make-safes, yes. Planned repairs are better scoped from the report and done in a follow-up visit, unless agreed in advance.

Who should interpret the findings?

The inspection records the condition. Defects that suggest structural or system problems should go to a structural or façade engineer.

Book a façade inspection

Send the address and any concerns. See our building maintenance and rope access in London, or request a site survey.

Sources

  • Occupiers' Liability Acts 1957 and 1984 (duty of care to people near the building).
  • BS 8210:2020, Facilities maintenance management: code of practice.
Keep reading

More guides

When Is Rope Access the Right Choice for High-Level Building Work?

Is rope access right for your job? A task-by-task guide to what it does well, where it struggles and when scaffold or a MEWP is better.

Read the guide →

When Should a Building's Anchor Provision Be Reviewed?

Beyond the annual BS 7883 inspection, seven situations mean your roof anchors need reviewing, such as refurbishment, new plant and missing records.

Read the guide →

When Cleaning Is Not Enough: Signs a Façade Needs Repair

A façade clean often uncovers defects the dirt was hiding: cracks, open joints, failed sealant, rust and spalling. What each means and what to do next.

Read the guide →
Planning work at height?

Need help with your building? Talk to our team.