Quick answer: Before a rope access contractor starts work on your building, ask to see current certificates for public liability and, if they employ anyone, employers' liability. Check that the cover limits meet your requirements, that the policy covers work at height and rope access (some policies restrict or exclude it), and that subcontractors are covered too. Don't accept a verbal assurance or an out-of-date certificate. A contractor with proper cover will send the documents on request.

Why insurance matters on a building

Work at height puts people, property and neighbouring buildings at risk. If something falls, a tool is dropped, water damage follows a repair, or a technician is injured, the cost can be far larger than the value of the job. Insurance is what pays for it. If the contractor's cover is missing or inadequate, the claim can come back to you as the building owner or manager.

The main types of cover

CoverWhat it is forIs it required?
Employers' liabilityInjury or illness to the contractor's own employeesLegally required in the UK for most businesses that employ people. The minimum cover is £5 million
Public liabilityInjury to other people, or damage to property, caused by the contractor's workNot a legal requirement for most firms, but most commercial clients require it
Professional indemnityClaims arising from advice, design or specification, such as a recommended repair methodOften relevant when the contractor designs or specifies the work
Contractors' all risks / works insuranceDamage to the work itself, and to the contractor's own tools and equipmentDepends on the contract
Product or completed operations coverProblems that appear after the work is finishedDepends on the work and the contract

Employers' liability is the one with a legal minimum. If a firm uses self-employed technicians, ask how they are covered, because employers' liability may not apply to them but they should have their own public liability cover.

How much public liability cover should you ask for?

There is no universal figure. Many commercial clients ask for public liability of at least £5 million, and some ask for £10 million or more on higher-value or higher-risk buildings. Your own requirements may be set by your:

  • building insurer or the landlord's insurance
  • lease or head-lease terms
  • managing agent's contractor procedures
  • client or tenant requirements

Check what applies to you before you send out a request for quotes, so every contractor is quoted against the same requirement.

What to check on the certificate

  • The insurer and the policyholder name match the contractor you are appointing, not a sister company
  • The dates: the certificate is current for the whole period of the work
  • The cover limits for each type of insurance
  • The business activities covered, and whether they include the work you need
  • Exclusions or restrictions: particularly any limit on working at height, working on ropes or working above a certain height
  • Whether subcontractors are covered
  • Whether the policy covers work in the location, such as occupied buildings and public areas
  • Whether your organisation can be noted as an interested party if your contract requires it

A certificate is a summary. For a large or higher-risk job, ask for the policy wording or a letter from the broker confirming the cover.

Traps to avoid

  • Height restrictions. Some public liability policies exclude work above a certain height or limit it, unless it is specifically declared. Always ask directly whether rope access and work at height are covered.
  • Out-of-date certificates. A certificate from last year proves nothing today.
  • Wrong entity. The certificate must name the company that will carry out the work.
  • Low limits. A cheap quote can come from a firm with minimal cover.
  • Subcontracting. If the main contractor uses others, make sure their cover is also in place.
  • "We're fully insured" with nothing in writing. Ask for the document.

Insurance is not the whole picture

Insurance pays after something goes wrong. It does not show that the work will be done safely. Look at the other evidence as well:

  • IRATA certification of the technicians, and Level 3 supervision. See our guide to IRATA certification
  • A site-specific risk assessment and method statement. See RAMS explained
  • A rescue plan. See rope access rescue plans
  • References and examples of similar work
  • Any pre-qualification or health and safety accreditation your organisation uses

Our guide to how to choose a rope access contractor puts these together in a single checklist.

Questions to ask

  • Can you send current certificates for employers' liability and public liability?
  • What are the limits on each?
  • Does the policy cover rope access and work at height, and to what height?
  • Are subcontractors covered, and by whom?
  • Is there any exclusion that might apply to this building or this work?
  • Can our organisation be named on the policy if our contract requires it?
  • Who is your broker, in case we need to confirm the details?

FAQ

Not for most businesses, although most commercial clients require it. Employers' liability is the one that is legally required for firms that employ people.

£5 million. Many contractors carry more.

Does the building owner's insurance cover contractor damage?

It may cover some of it, but it does not replace the contractor's own cover. Check with your insurer what they require from contractors.

Should we check insurance every year?

Yes, if you use the same contractor regularly. Certificates run for a fixed period, so ask for the renewal.

Talk to us

If you would like to see how we document insurance, risk assessments and method statements before work starts, ask us when you request a quote. Read about rope access in London, or request a site survey.

Sources

Keep reading

More guides

When Is Rope Access the Right Choice for High-Level Building Work?

Is rope access right for your job? A task-by-task guide to what it does well, where it struggles and when scaffold or a MEWP is better.

Read the guide →

When Should a Building's Anchor Provision Be Reviewed?

Beyond the annual BS 7883 inspection, seven situations mean your roof anchors need reviewing, such as refurbishment, new plant and missing records.

Read the guide →

When Cleaning Is Not Enough: Signs a Façade Needs Repair

A façade clean often uncovers defects the dirt was hiding: cracks, open joints, failed sealant, rust and spalling. What each means and what to do next.

Read the guide →
Planning work at height?

Need help with your building? Talk to our team.