Quick answer: A site survey is where the contractor sees your building in person, checks how the work can be done safely and works out what it will cost. You get a faster, more accurate quote if you have the following ready: roof and ground access (keys, codes, permits), building records (drawings, previous repairs, anchor certificates), the asbestos register, working-hours and tenant restrictions, photographs of the problem and the name of someone on site. Without them, the survey may need a second visit, and the quote will carry more assumptions.
What a site survey is for
On the visit, the contractor looks at:
- The task: what needs doing, and where
- Access: how technicians will reach the roof and each elevation
- Anchors: whether suitable, certified anchor points exist
- What is below: the pavement, entrances, car parks, neighbours and anything that needs protecting
- Hazards: fragile areas, plant, live equipment and overhead obstructions
- Constraints: working hours, noise, tenant access and security
The result should be a written scope, the access method the contractor recommends, a fixed quote and, before work starts, a risk assessment and method statement (RAMS). If the contractor believes another method such as scaffold or a platform would be better, a good one will say so. See rope access vs scaffolding and rope access vs MEWP.
The preparation checklist
Access
- Roof access: where it is, who holds the keys or codes, and whether a permit is needed
- Ground access: a point of contact for entrances, loading areas and car parks
- Parking and loading: where the team can park or unload, and any restrictions or permits
- Lifts and routes: whether equipment can be taken up by lift or must be carried
Records
- Drawings and elevations, if you have them
- Previous inspection reports and surveys
- Records of repairs and previous work on the areas concerned
- Anchor and fall-protection certificates, and their inspection dates
- Warranties that might be affected by the work
- Operation and maintenance information, where it exists
Safety information
- The asbestos register and management plan, which the contractor should see before drilling, cutting or disturbing any material
- Any known hazards: fragile roof areas, plant, rooflights, live electrical equipment, or contaminated materials
- Emergency procedures: how incidents are reported, and who to call
- Permit-to-work requirements, if your building uses them
The problem itself
- Photographs of the issue, with locations noted
- A leak diary, if you are tracing water ingress. See façade leak investigation
- A note of when it started and what has been tried
- Any inspection findings, from a drone survey or earlier visit
Constraints
- Working hours, including any quiet hours and weekend or out-of-hours rules
- Tenant requirements: notice periods, sensitive areas, and anyone who needs to be told
- Neighbours and public areas: busy pavements, events and shared access
- Security and ID: how the team will sign in and out
- Landlord or head-lease permissions that may be needed
People
- A named contact at the building, with a phone number
- Who has authority to approve the work and the budget
Why asbestos information matters
If the building was built or refurbished before 2000, materials on the roof or façade may contain asbestos. In non-domestic buildings, the Control of Asbestos Regulations 2012 require the people responsible for the premises to manage it, usually through a register and management plan. A contractor should not drill, cut or disturb materials until they have seen it. If you do not have a register, say so at the start so the work can be planned around it.
What you should receive after the survey
- A written scope that says what is included and excluded
- A recommended access method and the reasons for it
- A fixed quote with the assumptions it depends on
- A programme, including how long the work is likely to take
- A statement of RAMS and rescue arrangements. See rope access rescue plans
- Requests for information the contractor still needs from you
If the quote is hard to compare with others, our guide to what affects a rope access quote explains the factors that move it.
Questions to ask on the visit
- What access method do you recommend, and why?
- Do you see any hazards that I should know about?
- What assumptions is your quote based on?
- What could change the price once work starts?
- How long will the work take, and what could delay it?
- How will you protect tenants, the public and the building?
- Who will be on site, and what are their qualifications?
Our guide to how to choose a rope access contractor covers further questions.
FAQ
How long does a survey take?
It depends on the size and complexity of the building. A small job may take an hour or so, and a large building longer. Ask the contractor when you book it.
Do we need to be there?
Someone with knowledge of the building should be, or at least be reachable, so the contractor can access the roof and ask questions.
Can a quote be given from photographs?
For simple tasks, sometimes, with stated assumptions. For leaks, defects or large areas, a survey gives a firmer price and avoids surprises.
What if we do not have records?
Say so. The contractor can plan around missing information, although they may need to check or test more on site.
Request a site survey
Tell us the address, what you want done and any access constraints. We will arrange a visit and explain what we need from you. Read about rope access in London, or request a site survey.
Sources
- The Control of Asbestos Regulations 2012 and HSE asbestos guidance.
- The Work at Height Regulations 2005 (legislation.gov.uk).
- IRATA International, International Code of Practice for Industrial Rope Access (ICOP). Check the current edition.