Quick answer: Quotes, reports and method statements for work at height use a lot of specialist words. This glossary explains the ones building managers meet most often, in plain English. It is arranged in three groups: rope access and safety, roofs and drainage, and façades and defects. Where a term has its own guide on this site, you will find a link to it.
Rope access and safety terms
| Term | What it means |
|---|---|
| Anchor (anchor point or anchor device) | A strong fixing on the structure that a rope or lanyard attaches to. See anchor point inspection |
| Back-up line (safety line) | The second rope that protects a technician if the working line fails |
| Drop | One vertical run of rope from the roof down the building. Each new position usually needs a new drop |
| Exclusion zone (drop zone) | The area below work at height that is kept clear of people. See public safety during façade work |
| ICOP | The International Code of Practice for Industrial Rope Access, published by IRATA, which sets out how rope access should be done |
| IRATA | The Industrial Rope Access Trade Association, which trains and certifies rope access technicians. See IRATA certification explained |
| Level 1, 2 and 3 | The three IRATA technician grades. Level 3 is the supervisor responsible for the site |
| MEWP | Mobile elevating work platform, such as a cherry picker or scissor lift. See rope access vs MEWP |
| Permit to work | A formal authorisation for a specific job in a specific place for a limited time. See permit to work explained |
| RAMS | Risk assessment and method statement. See RAMS explained |
| Rescue plan | The written plan for bringing a technician to safety if something goes wrong. See rope access rescue plans |
| Work positioning | Using ropes to support a worker at a place of work, as distinct from catching a fall |
| Working line | The main rope that supports a technician while they move and work |
Roof and drainage terms
| Term | What it means |
|---|---|
| Coping | The capping on top of a parapet wall that sheds water. See parapet, coping and flashing defects |
| Fall (roof fall) | The slight slope that makes water run towards outlets |
| Flashing | A strip of metal or other material that seals the junction between a roof and a wall or other element |
| Outlet | The opening where water leaves a roof or gutter and enters a downpipe |
| Parapet | A low wall at the edge of a roof |
| Ponding | Water that stays on a roof long after rain has stopped. See flat roof problems |
| Rooflight | A window in a roof. Often fragile. See roof inspections: safe access and fragile roofs |
| Upstand | The part of a roof covering that turns up against a wall or other vertical element |
| Valley | The channel where two roof slopes meet |
Façade and defect terms
| Term | What it means |
|---|---|
| Cavity barrier | A fire-stopping element inside the cavity of a wall. Not to be altered without competent advice. See rainscreen cladding maintenance |
| Curtain wall | A lightweight glass and metal façade hung from the structure. See curtain wall maintenance |
| Efflorescence | White salt deposits left on masonry as moisture evaporates. See efflorescence |
| Gasket | A rubber or synthetic seal used in glazing and cladding systems |
| Mullion and transom | The vertical (mullion) and horizontal (transom) frame members of a curtain wall |
| Pointing | The mortar finish between bricks or stones |
| Rainscreen cladding | An outer layer of panels with a ventilated cavity behind it |
| Render | A coating of cement, lime or similar material applied to a wall |
| Sealant (mastic) | A flexible material that fills and weatherproofs joints. See façade sealant failure |
| Soffit | The underside of an overhang, canopy or balcony |
| Spalling | Pieces of concrete or masonry breaking away from the surface. See concrete cracks and spalling |
| Spandrel panel | The opaque panel in a glazed façade, usually between floors |
| Weep hole | A small opening that lets water drain out of a system |
Terms you might see on a quote
| Term | What it means |
|---|---|
| Mobilisation | Getting the team and equipment to site and set up |
| Provisional sum | A budget for work that cannot be priced until more is known |
| Make safe | Temporary action to remove an immediate hazard |
| Making good | Restoring a surface to a tidy finish after work |
| Preliminaries | Costs that support the work, such as supervision, welfare, access and insurance |
| Day rate | A price per team per day. See how rope access is priced |
FAQ
Why do reports use so many technical terms?
They are precise shorthand for people in the industry. A good report should explain them, or include a glossary.
Where can I find the official definitions?
Standards and regulations define terms formally, for example the Work at Height Regulations 2005 and IRATA's code of practice.
What should I do if a term in my quote is unclear?
Ask the contractor. A good one will explain it in plain English.
Talk to us
If a quote, report or method statement uses a term you do not understand, ask us. Read about rope access in London, or request a site survey.
Sources
- IRATA International, International Code of Practice for Industrial Rope Access (ICOP). Check the current edition.
- The Work at Height Regulations 2005 (legislation.gov.uk).
- Manufacturer and trade body guidance on cladding, glazing and roofing terms.



