Spring Exterior Maintenance Checklist for Commercial Buildings

After winter, check the roof, façade, gutters and fixings for frost and storm damage, and plan sealing, painting and cleaning for the dry months.

Quick answer: Spring is the time to find what winter did and to book the work that needs mild, dry weather. Check roofs, flashings and coverings for storm and frost damage, clear gutters and outlets of winter debris, inspect sealant, joints and cladding for cracks and movement, look for frost damage and spalling in masonry and concrete, and check fixings, signage and anchors. Then plan the jobs that need good weather, such as re-sealing, repainting, waterproofing and cleaning, so that they happen in the drier months. Record what you find with photographs so you can compare year to year.

Why spring matters

Winter is hard on buildings. Rain, wind, freezing and thawing all find weak points, and many defects only show once the weather improves. Finding them in spring gives you time to repair before the next winter, while conditions suit sealants, coatings and repairs. It is also a natural counterpart to the checks you make before winter. See our winter exterior maintenance checklist.

The spring checklist

Roofs and drainage

  • Inspect roof coverings for lifted, slipped or missing tiles, splits, blisters and open laps. See flat roof problems
  • Check flashings, copings and parapets for lifted or cracked details. See parapet, coping and flashing defects
  • Clear gutters, valleys, outlets and downpipes of leaf litter, silt and debris. See gutter clearance
  • Look for ponding water and areas that stayed wet
  • Check rooflights, vents and penetrations
  • Remove moss and growth from roofs and gutters

Façade

Fixings and attachments

  • Check signage, lighting, CCTV and aerials for looseness and corrosion. See high-level signage installation
  • Check bird netting and spikes are intact
  • Check flagpoles, brackets and external equipment

Safety and access

Records

  • Photograph and log every defect, with its location
  • Compare with last year's records
  • Prioritise into urgent, planned and monitor

Urgent, planned or monitor?

FindingPriority
Loose cladding, falling material, open roof areas, active leaksUrgent. Make safe now
Failed sealant, damaged flashings, blocked outlets, damaged fixingsPlan and book soon
Early cracking, minor staining, light growthMonitor and plan
Cosmetic issuesInclude in the long-term plan

Plan the dry-season work

Mild, dry weather suits jobs that cannot be done properly in the cold or wet. Spring and early summer are a good time to book:

WorkWhy it suits warmer months
Re-sealing jointsSealants need dry surfaces and mild temperatures
Repainting and coatingNeeds suitable temperature and dry conditions. See external repainting
Waterproofing and repairsNeeds dry weather. See façade waterproofing coatings
Façade and window cleaningRemoves winter dirt and salt. See how often to clean façades
Roof repairsMost products need dry, mild weather

Contractors tend to book up in the good-weather months, so ask early. Grouping tasks so that they share access reduces cost and disruption. See planned façade maintenance.

Getting safe access for the inspection

Many spring checks need someone to look at high and awkward areas from close range. A drone can screen the whole building quickly, and rope access can look at the details and carry out minor repairs on the same visit. Check the methods and whether the safety information is in place. See what drone inspections can and can't show and site survey checklist.

FAQ

When in spring should the inspection happen?

Once the worst of the winter weather has passed, and early enough to leave time to plan repairs for the good-weather months.

Is it enough to inspect from the ground?

Ground-level checks help, but most roof and upper façade defects can only be seen close-up. Use safe access.

What if I find damage?

Make safe anything that could fall, record it and get it assessed. See storm damage to a building exterior.

How does this fit with a maintenance plan?

It is the spring part of the annual cycle: inspect in spring, repair and clean in summer, prepare for winter in autumn.

Talk to us

If you want hands-on access for your spring inspection, send us the address and a note of anything you are worried about. Read about our building maintenance and roof repairs and inspection services, or request a site survey.

Sources

  • The Work at Height Regulations 2005 (legislation.gov.uk).
  • Manufacturer guidance for the sealants, coatings and roof coverings on your building.
  • Your building's maintenance records and warranty requirements.
Keep reading

More guides

When Is Rope Access the Right Choice for High-Level Building Work?

Is rope access right for your job? A task-by-task guide to what it does well, where it struggles and when scaffold or a MEWP is better.

Read the guide →

When Should a Building's Anchor Provision Be Reviewed?

Beyond the annual BS 7883 inspection, seven situations mean your roof anchors need reviewing, such as refurbishment, new plant and missing records.

Read the guide →

When Cleaning Is Not Enough: Signs a Façade Needs Repair

A façade clean often uncovers defects the dirt was hiding: cracks, open joints, failed sealant, rust and spalling. What each means and what to do next.

Read the guide →